§ 1145.26. Permit-to-install (PTI) requirements.


Latest version.
  • Users of the sewer system shall design, construct, operate, and maintain controls including but not limited to wastewater pretreatment, equalization, monitoring, sampling and/or flow measuring facilities whenever necessary for the user to achieve compliance with the limitations set forth in this chapter.

    Where wastewater pretreatment, equalization, monitoring, sampling and/or flow measuring facilities are required, plans, specifications, operating procedures, and other pertinent data and information shall be submitted by the discharger to the director for review and approval, prior to installation of any necessary equipment. PTI submittals must be made using forms supplied by the industrial pretreatment section. The review of such plans and operating procedures does not relieve the discharger from the responsibility to produce acceptable wastewater characteristics before discharging to the POTW.

(Ord. No. 1327-2012, § 1, 7-23-2012, eff. 10-1-2012)